10th St. Reservoir

Work performed includes: Demolition of two existing reinforced concrete reservoirs, 17,000 CY of excavation for new reservoir tank, construction of a 2 million gallon strandwrapped prestressed concrete reservoir and associated sitework, piping and electrical systems. Work also includes approximately 2,000 feet of offsite 8-inch and 12-inch watermains.

  • Location: East Wenatchee, WA
  • Owner:East Wenatchee Water District
  • Engineer: RH2 Engineering, Inc.
  • Status: Currently Under Construction