10th St. Reservoir
Work performed includes: Demolition of two existing reinforced concrete reservoirs, 17,000 CY of excavation for new reservoir tank, construction of a 2 million gallon strandwrapped prestressed concrete reservoir and associated sitework, piping and electrical systems. Work also includes approximately 2,000 feet of offsite 8-inch and 12-inch watermains.
Location:
East Wenatchee
Owner:
East Wenatchee Water District
Engineer:
RH2 Engineering
Status:
Currently Under Construction